Due to Copernicus Sentinel-3B Moon calibration, data will be degraded on hereafter products:

  • Copernicus Sentinel-3BSLSTR: products degradation is expected for sensing time from 12/08/2022T07:58:20 to 12/08/2022T08:48:50

  • Copernicus Sentinel-3B OLCI: products degradation is expected for sensing time from 12/08/2022T08:42:52 to 12/08/2022T08:48:50

  • Copernicus Sentinel-3B SRAL: products degradation is expected for sensing time from 12/08/2022T07:59:20 to 12/08/2022T08:30:18

Due to S3B Sentinel-3B Orbit Correction Manoeuvre occurred from 9th of August at 07:55:45 UTC to 9th of August at 08:05:35, SLSTR data in the specified period may be degraded.

Due to S3A SLSTR instrument anomaly occurred from 1st of August 2022 at 01:56:08 UTC to 4th of August 2022 at 03:57:02 UTC, SLSTR data in the specified period is unavailable or degraded.

As a consequence of a ground segment anomaly, the Sentinel-2A systematic production was stopped the 02 August from 00:00:00 UTC to 08:30:00 UTC, leading to all S2A production unavailable. 

An update will follow with the plans for the recovery of the impacted production. 

We apologise for any inconvenience this might cause to your activities.

Due to Sentinel-3A SLSTR instrument anomaly, SLSTR data degradation or unavailability is expected starting from 1st of August 2022 at 01:56:00 UTC. Issue is under investigation.

Due to predicted outage for S3A in-Plane Manoeuvre #068, SLSTR products degradation is expected for sensing time from 21/07/2022T06:36:45  to 21/07/2022T06:46:35.

Due to Copernicus Sentinel-3A Moon calibration, data will be degraded on hereafter products:

  • Copernicus Sentinel-3ASLSTR: products degradation is expected for sensing time from 13/07/2022T23:21:46 to 14/07/2022T00:12:16

  • Copernicus Sentinel-3A OLCI: products degradation is expected for sensing time from 13/07/2022T00:06:35 to 14/07/2022T00:12:16

  • Copernicus Sentinel-3A SRAL: products degradation is expected for sensing time from 13/07/2022T23:22:46 to 13/07/2022T23:54:06

Due to predicted outage for S3B In Plane Manoeuvre #061, SLSTRproducts degradation is expected for sensing time from 29/06/2022T08:48:40 to 29/06/2022T08:58:43.

Due to SLSTR instrument anomaly occurred from 20th of June 2022 at 02:51:19 UTC to 22nd of June 2022 at 18:42:00 UTC, SLSTR data in the specified period is unavailable or degraded:

  • SLSTR VIS channels degraded from 20/06/2022 02:51 UTC to 11:43 UTC

  • SLSTR IR channels invalid from 20/06/2022 02:51 UTC to 11:43 UTC

  • SLSTR VIS and IR channels unavailable from 20/06/2022 11:42 to 15:00 UTC

  • SLSTR VIS and IR channels invalid from 20/06/2022 14:59 to 21/06/2022 07:54 UTC

  • SLSTR VIS and IR channels unavailable from 21/06/2022 07:53 to 09:38 UTC

  • SLSTR VIS channels degraded from 21/06/2022 09:37 to 22/06/2022 18:42 UTC

  • SLSTR IR channels invalid from 21/06/2022 09:37 to 22/06/2022 18:42 UTC

Due to predicted outage for S3A In-Plane manoeuvre #067, SLSTR products degradation is expected for sensing time from 14/06/2022T09:25:45 to 14/06/2022T09:35:35

Due to Copernicus Sentinel-3B Moon calibration, data will be degraded on hereafter products:

  • Copernicus Sentinel-3B SLSTR: products degradation is expected for sensing time from 14/06/2022T21:53:28 to 14/06/2022T22:43:58
  • Copernicus Sentinel-3B OLCI: products degradation is expected for sensing time from 14/06/2022T22:35:10 to 14/06/2022T22:43:58
  • Copernicus Sentinel-3B SRAL products degradation is expected for sensing time from 14/06/2022T21:54:28 to 14/06/2022T22:25:48

Due to predicted outage for S3B for OLCI S09 Calibration, OLCIproducts degradation is expected for sensing time from 15/06/2022T09:06:13 to 15/06/2022T09:07:23.

Due to predicted outage for S3A for OLCI S09 Calibration, OLCI products degradation is expected for sensing time from 05/06/2022T09:04:23 to 05/06/2022T09:05:33.

Due to predicted outage for S3B In-Plane manoeuvre #060, SLSTR products degradation is expected for sensing time from 24/05/2022T07:45:39 to 24/05/2022T07:55:43.

Due to predicted outage for S3A In-Plane manoeuvre #066, SLSTR products degradation is expected for sensing time from 18/05/2022T06:03:24 to 18/05/2022T06:13:28.

An in-situ sea ice monitoring campaign that was completed off the west coast of Greenland is set to help reinforce confidence in data delivered by Copernicus Sentinel-3. To collect the sea ice measurements, scientists used a conventional aircraft that carries observation systems, as well as new technologies, such as monitoring buoy and a drone equipped with radar and imaging instruments. The campaign – which was led by the Technical University of Denmark (DTU) – formed part of the St3TART project, an initiative led by science engineering firm NOVELTIS that facilitates the production of high-quality, robust information from the Sentinel-3 mission of the European Union’s Copernicus Programme.

Due to Copernicus Sentinel-3B DORIS Software Update activity, SRAL products degradation is expected for the following sensing times: from 24/05/2022T08:20:00 to 24/05/2022T08:22:00 and from 25/05/2022T07:55:00 to 25/05/2022T07:57:00.

Due to Copernicus Sentinel-3B SRAL annual calibration, SRAL product degradation is expected from 11/05/2022T20:23:10 to 11/05/2022T20:24:31.

Due to Copernicus Sentinel-3A DORIS Software Update activity, SRAL products degradation is expected for the following sensing times: from 13/05/2022T08:42:00 to 13/05/2022T08:44:00 and from 16/05/2022T10:44:00 to 16/05/2022T10:46:00.