News

Web Content Image

Copernicus Sentinel-5P: new SO2 Layer Height information availability

Copy linkSaved
Share on Linkedin

An update of the Copernicus Sentinel-5 Precursor (S5p) operational ground-processing system is planned to start in the morning of 19 July 2023 and finish by 20 July in the afternoon. This includes the addition of new variables related to a new parameter ‘SO2 Layer Height’ into the SO2 product, as detailed in the news of 30 May 2023.

Full detailed information will be provided within the SO2 documentation after the operational switch.

Please note that NRT products for data acquired during the downtime period will be not generated. After the successful deployment of the new system, version numbers of the first orbit generated with the new version of the operational processor both, in NRT and OFFL, will be provided.

An update of the Copernicus Sentinel-5 Precursor (S5p) operational ground-processing system is planned to start in the morning of 19 July 2023 and finish by 20 July in the afternoon. This includes the addition of new variables related to a new parameter ‘SO2 Layer Height’ into the SO2 product, as detailed in the news of 30 May 2023.

Full detailed information will be provided within the SO2 documentation after the operational switch.

Please note that NRT products for data acquired during the downtime period will be not generated. After the successful deployment of the new system, version numbers of the first orbit generated with the new version of the operational processor both, in NRT and OFFL, will be provided.


Menu Display

Key Resources