Minimize Document Library

Sentinel-3A Product Notice - STM Level-2 Land NRT, STC and NTC

This is a Product Notice for the public release of Sentinel­‐3 Surface Topography Mission (STM) Level­‐2 Land products at Near Real Time (NRT), Short Time Critical (STC) and Non Time Critical (NTC) timeliness. The notice describes the S‐3A STM current status, processing baseline, product quality and limitations, and product availability status.

REFERENCE
 
FORMAT
PDF  
ISSUE
1.0  
DATE
13 December 2017
AUTHORSHIP
ESA  
PAGES
12  
KEYWORDS
Sentinel-3, Surface Topography Mission, Land  
TYPE
Product Document  
PDF