- Use the Document Library page to search for a specific documentation
- Click on the "Read more..." link to access additional information, such as publication date, description and authorship.
Sentinel-3 STM Annual Performance Report - 2022
The purpose of this document is to provide the status of the Sentinel-3 STM and product performance for 2023.
- REFERENCE
- S3MPC-STM_RP_0062
- FORMAT
- ISSUE
- 1.1
- DATE
- 22 March 2023
- AUTHORSHIP
- S3-MPC
- PAGES
- 130
- KEYWORDS
- Sentinel-3, Altimetry, STM, Performance
- TYPE
- General Reference
- Upgrade from POE-E to POE-F orbit standard for Sentinel-3 mission
- Update of S-1 Instrument Timing Calibration for ETAD
- Thermal denoising of products generated by the Sentinel-1 IPF
- Tailoring of the Earth Observation File Format Standard for the Sentinel-5P Ground Segment
- Sentinels POD Product Handbook