Due to a SRAL Digital Elevation Mode EEPROM patching operations, SRAL mission data was unavailable during the following period:
22 June 2017 from 08:48:42 to 08:54:08 (Duration 00:05:26).
Due to a SRAL Digital Elevation Mode EEPROM patching operations, SRAL mission data was unavailable during the following period:
22 June 2017 from 08:48:42 to 08:54:08 (Duration 00:05:26).
SRAL was operating in LRM_CL from 08:53:39 to 08:54:08.