Breadcrumb

Sentinel-2B MSI decontamination between 4 and 5 December 2023

Sentinel-2B MSI decontamination between 4 and 5 December 2023

Copy linkSaved
Share on Linkedin

A routine decontamination activity of the Sentinel-2B MSI is planned to take place over a continuous period of 24-hours between 4 December 2023 at 09:00 UTC and 5 December 2023 at 09:00 UTC (corresponding approximately to the period between absolute orbits 35225 and 35239). During this temporal window no MSI acquisition will take place.

Correlated calibration activities will be performed around the decontamination period that will further affect the nominal acquisition plan between 04 December 2023 at 01:22 UTC and 06 December 2023 at 00:23 UTC.

A routine decontamination activity of the Sentinel-2B MSI is planned to take place over a continuous period of 24-hours between 4 December 2023 at 09:00 UTC and 5 December 2023 at 09:00 UTC (corresponding approximately to the period between absolute orbits 35225 and 35239). During this temporal window no MSI acquisition will take place.

Correlated calibration activities will be performed around the decontamination period that will further affect the nominal acquisition plan between 04 December 2023 at 01:22 UTC and 06 December 2023 at 00:23 UTC.