Sentinel-1 N-Cyclic Performance Report 2023-04
Sentinel-1 N-Cyclic Performance Report 2023-04
This document provides a status on the S1-A sensor and product performance for orbit repeat cycle 293 to 296.
- REFERENCE
- DI-MPC-NPR-0100
- FORMAT
- ISSUE
- 2023-04.0
- DATE
- 27 July 2023
- AUTHORSHIP
- SAR-MPC
- PAGES
- 43
- KEYWORDS
- Sentinel-1, SAR, Performance
- TYPE
- Product Document
- Upgrade from POE-E to POE-F orbit standard for Sentinel-3 mission
- Update of S-1 Instrument Timing Calibration for ETAD
- Thermal denoising of products generated by the Sentinel-1 IPF
- Tailoring of the Earth Observation File Format Standard for the Sentinel-5P Ground Segment
- Sentinels POD Product Handbook