Copernicus Sentinels 4 and 5 mission requirements traceability document (MRTD)
Copernicus Sentinels 4 and 5 mission requirements traceability document (MRTD)
This mission requirements traceability document (MRTD) elaborates and further clarifies in detail the Copernicus (former GMES) Sentinel-4, -5, and -5Precursor (S5P) Mission Requirements specified in the Sentinel-4/-5 Mission Requirements Document (MRD) (/ESA2007/)through the definition of unambiguous and traceable numbered requirements used by the Sentinels-4, -5 and -5P implementation teams. The Sentinel-4/-5 MRTD and MRD are managed by the Sentinel-4, -5 and 5P mission scientists according to the procedure set out in /ESA2012/.
- REFERENCE
- EOP-SM/2413/BV-bv
- FORMAT
- ISSUE
- 2.0
- DATE
- 07 July 2017
- AUTHORSHIP
- ESA
- PAGES
- 166
- KEYWORDS
- TYPE
- Technical Document
- Upgrade from POE-E to POE-F orbit standard for Sentinel-3 mission
- Update of S-1 Instrument Timing Calibration for ETAD
- Thermal denoising of products generated by the Sentinel-1 IPF
- Tailoring of the Earth Observation File Format Standard for the Sentinel-5P Ground Segment
- Sentinels POD Product Handbook