Sentinel-3 STM Annual Performance Report - 2017
Sentinel-3 STM Annual Performance Report - 2017
This document provides a summary of the end-to-end mission performance since the start of the Sentinel-3 mission and of the main activities carried out by the Sentinel-3 Mission Performance Centre during the first year of the routine operations phase, which began on 1 February 2017.
This report focuses on the altimetry mission.
- REFERENCE
- FORMAT
- ISSUE
- 1.1
- DATE
- 23 May 2018
- AUTHORSHIP
- Collecte Localisation Satellites (CLS)
- PAGES
- 194
- KEYWORDS
- Sentinel-3, Altimetry
- TYPE
- General Reference