Minimize SRAL L1 and L2 Processing Baseline

A new processing baseline is delivered each time there is an update of an instrument processing facility (IPF), or an update of a set of auxiliary data files (ADFs), or both. It thus happens that a new processing concerns only an update of an IPF, or only an update of ADF(s).

More details about the different processing baselines are available in the Sentinel-3A Altimetry Product Baselines Summary

The following table summarises the evolutions of the processing baseline used to process Sentinel-3A Altimetry data since July 2016, the end of the commissioning phase.

Processing Baseline version Date into operations Product Notice (if available)
2.33 04 April 2018 Level 1: Sentinel-3 Product Notice – Altimetry

Level 2: Sentinel-3A Product Notice – LAND L2 NRT, STC and NTC
2.27 14 February 2018 Level 1:S3 Product Notice – Altimetry

Level 2: Sentinel-3A Product Notice – LAND L2 NRT, STC and NTC

2.24

13 December 2017

Level 1: S3 Product Notice – Altimetry


Level 2: Sentinel-3A Product Notice – LAND L2 NRT, STC and NTC

2.15

12 April 2017

Level 2: Sentinel-3A Product Notice – LAND L2 NRT, STC and NTC

2.12

12 April 2017

Level 1: Sentinel-3A Product Notice – STM L1 Altimetry (NRT, STC and NTC)


Level 2: Sentinel-3A Product Notice – LAND L2 NRT, STC and NTC

2.10

28 February 2017

Level 1: Sentinel-3A Product Notice – STM L1 (NRT, STC and NTC)

2.09

17 November 2016

N/A


Sentinel-3 Altimetry Processing Baseline 2018 Timeline

Sentinel-3 Altimetry Processing Baseline 2018 Timeline

Sentinel-3 Altimetry Processing Baseline 2016-2017 Timeline

Sentinel-3 Altimetry Processing Baseline 2016-2017 Timeline