Minimize Document Library

Sentinel-3A Product Notice - STM Level-2 Land NRT, STC and NTC

This is a Product Notice for the public release of Sentinel-3 Surface Topography Mission (STM) Level-2 Land products at Near Real Time (NRT), Short Time Critical (STC) and Non Time Critical (NTC) timeliness.

The Notice describes the Sentinel-3A STM current status, product quality and limitations, and product availability status. This document is applicable to Sentinel-3A and Sentinel-3B products.

REFERENCE
S3A.PN-STM-L2L.06  
FORMAT
PDF  
ISSUE
1.0  
DATE
04 April 2018
AUTHORSHIP
Sentinel-3 Mission Performance Centre, ESA, EUMETSAT  
PAGES
12  
KEYWORDS
Sentinel-3, Surface Topography Mission, Land  
TYPE
Product Document  
PDF