Minimize Document Library

Sentinel-1A N-Cyclic Performance Report 07 2017

The purpose of this document is to provide a status on the Sentinel-1 A sensor and product performance for orbit repeat cycle from 01 October consisting of cycle 121-124 ending on 18 November 2017.

REFERENCE
MPC-0100  
FORMAT
PDF  
ISSUE
1.0  
DATE
01 December 2017
AUTHORSHIP
Collecte Localisation Satellites (CLS)  
PAGES
31  
KEYWORDS
Sentinel-1, Mission Performance Centre, N-Cyclic Report  
TYPE
General Reference  
PDF