Document Library

Copernicus Sentinels 4 and 5 mission requirements traceability document (MRTD)

This mission requirements traceability document (MRTD) elaborates and further clarifies in detail the Copernicus (former GMES) Sentinel-4, -5, and -5Precursor (S5P) Mission Requirements specified in the Sentinel-4/-5 Mission Requirements Document (MRD) (/ESA2007/)through the definition of unambiguous and traceable numbered requirements used by the Sentinels-4, -5 and -5P implementation teams. The Sentinel-4/-5 MRTD and MRD are managed by the Sentinel-4, -5 and 5P mission scientists according to the procedure set out in /ESA2012/.

REFERENCE
EOP-SM/2413/BV-bv  
FORMAT
PDF  
ISSUE
2.0  
DATE
07 July 2017
AUTHORSHIP
ESA  
PAGES
166  
KEYWORDS
 
TYPE
Technical Document  
PDF 

Menu Display