Document Library

Sentinel-5P Calibration and Validation Plan for the Operational Phase

The scope of this document is to define the Sentinel-5 Precursor Calibration and Validation activities during the operational phase (E2). It provides the high-level overview on the main aspects and teams involved in the S5P Cal/Val activities.

REFERENCE
ESA-EOPG-CSCOP-PL-0073  
FORMAT
PDF  
ISSUE
1  
DATE
06 November 2017
AUTHORSHIP
EOP-GMQ  
PAGES
26  
KEYWORDS
TROPOMI  
TYPE
Technical Document  
PDF 

Menu Display