Document Library

Sentinel-2 L1C Data Quality Report Issue 74 (April 2022)

This document provides the status of the Sentinel-2 Level-1C product quality as it stands in April 2022. It updates the information supplied in previously issued Reports.

REFERENCE
S2-PDGS-MPC-L1CDQR  
FORMAT
PDF  
ISSUE
74  
DATE
10 April 2022
AUTHORSHIP
MPC Team  
PAGES
57  
KEYWORDS
Sentinel-2, MSI, Data Quality Report  
TYPE
Technical Document  
PDF 

Navigation Menu