Use Typologies and Available Services

Open access hub

Copernicus Open Access Hub

Open to all users via self-registration

Available missions:

  • Sentinel-1
  • Sentinel-2
  • Sentinel-3
  • Sentinel-5P

Product types:

  • Sentinel-1, 2, 3 NTC: One year after acquisition
  • Sentinel-3 NRT/STC: One month after acquisition
  • Sentinel-5P NRT: One month after acquisition
  • Sentinel-5P OFFL: Two years after acquisition

Maximum of two concurrent downloads

Access to the LTA

 

Collaborative hub

Collaborative Hub

Open to Collaborative Ground Segment users and Data Hub Relay users

Available missions:

  • Sentinel-1
  • Sentinel-2
  • Sentinel-3

Product types:

  • Node 1:
    • Sentinel-1, 2, 3 NTC: One year after acquisition
    • Sentinel-1 NRT/STC: One month after acquisition
    • Sentinel-3 NRT/STC: One month after acquisition
  • Node 2: Two weeks after acquisition
  • Node 3: Two weeks after acquisition

Maximum of 10 concurrent downloads per Node

Access to the LTA

International hub

International Hub

Open to users with International Agreements

Available missions:

  • Sentinel-1
  • Sentinel-2
  • Sentinel-3

Products available three weeks after acquisition

Maximum of 10 concurrent downloads

No access to the LTA

 

 

 

Copernicus services hub

Copernicus Services Hub

Open to registered users and DIAS partners

Available missions:

  • Sentinel-1
  • Sentinel-2
  • Sentinel-3

Products types:

  • Sentinel-1, 2, 3 NTC: One year after acquisition
  • Sentinel-1 NRT: One month after acquisition
  • Sentinel-3 NRT/STC: One month after acquisition

Maximum of 10 concurrent downloads

Access to the LTA

The following codes are used to indicate timeliness of products. Availability following sensing time depends on the nature of the platform, instrument and level of service:

  • NRT: Near Real Time production
  • STC: Short Time Critical production
  • NTC: Non Time Critical production

Navigation Menu

Maintenance Announcements

Copernicus Sentinel-2B MSI decontamination between 13 and 14 December 2021

06 December 2021

A routine decontamination activity of the Copernicus Sentinel-2B MSI is planned to take place over a continuous period of 24 hours between 09:00 UTC on 13 December 2021 and 09:00 on 14 December (corresponding approximately to the period between absolute orbits 24915 to 24929). During this temporal window no MSI acquisitions will take place.

Correlated calibration activities will be performed around the decontamination period, which will further affect the nominal acquisition plan between 00:10 UTC on 13 December and 07:40 on 15 December.