- Mission Status
- Sentinel Data Access
- Sentinel-1 Data Access and Products Fact Sheet
- Sentinel Products List
- Operational Ramp-Up Phase
- Observation scenario
- Sentinel-1 ESA Special Publication
- SAR basic theory and practical exercises with SNAP (English)
- SAR basic theory and practical exercises with SNAP (French)
Sentinel-2A MSI decontamination between 14 and 17 September 2018
Sentinel-2A MSI decontamination between 14 and 17 September 2018
23 August 2018
A routine decontamination activity of the Sentinel-2A MSI is planned to take place over a continuous period of 24-hours between 15 and 16 September, from 07:00 to 07:00 UTC (corresponding to the period between absolute orbits 16877 to 16891). During this temporal window, no MSI acquisition will take place.
Correlated calibration activities will be performed around the decontamination period which will affect the nominal acquisition plan even further between 14 and 17 September from 17:00 to 09:20 UTC.
Sentinel-1 Key Resources