News

Web Content Image

Sentinel-3A Altimetry processor upgrade

Copy linkSaved
Share on Linkedin

The S-3A Altimetry Processing Baseline (PB) 2.27 was deployed on 14 February 2018 at the ESA Sentinel-3 Land centres.

Additional information on the PB 2.27 content is available from the S-3A STM product notice:

The S-3A Altimetry Processing Baseline (PB) 2.27 was deployed on 14 February 2018 at the ESA Sentinel-3 Land centres.

Additional information on the PB 2.27 content is available from the S-3A STM product notice:

The applicable Product Format Specification (PFS) documents are available for the Level 1 and the Level 2 Land products.


Menu Display

Key Resources