- Use the Document Library page to search for a specific documentation
- Click on the "Read more..." link to access additional information, such as publication date, description and authorship.
Impact of ECMWF Model Change CY43R3 on STM products
Impact of ECMWF Model Change CY43R3 on STM products
The operational Integrated Forecasting System (IFS) of the European Centre for Medium-Range Weather Forecasts (ECMWF) was upgraded to CY43R3 on 11 July 2017. This technical note provides estimates of the impact of these changes on Sentinel-3's STM products.
- REFERENCE
- S3MPC.ECM.MEM.045
- FORMAT
- ISSUE
- 1.0
- DATE
- 07 July 2017
- AUTHORSHIP
- ECMWF
- PAGES
- 17
- KEYWORDS
- Sentinel-3, Altimetry, ECMWF
- TYPE
- Technical Document
- Upgrade from POE-E to POE-F orbit standard for Sentinel-3 mission
- Update of S-1 Instrument Timing Calibration for ETAD
- Thermal denoising of products generated by the Sentinel-1 IPF
- Tailoring of the Earth Observation File Format Standard for the Sentinel-5P Ground Segment
- Sentinels POD Product Handbook